Correct load bank selection
Power, voltage, phase count, load type and test duration are reviewed for the generator, UPS or DC source.
For commissioning, scheduled maintenance or temporary capacity tests, Niawell selects the appropriate load bank and provides delivery, setup and engineering support.

Power, voltage, phase count, load type and test duration are reviewed for the generator, UPS or DC source.
Transport, cabling, safe connection and test preparation can be coordinated for the site.
When required, a Niawell engineer manages staged loading, monitors parameters and records test results on site.
Load bank rental supports generator acceptance tests, UPS capacity checks, data-centre emergency power testing, rectifier and DC power-supply tests, controlled battery discharge and preventive maintenance. It is suitable when permanent ownership is unnecessary or a specific rating is needed temporarily.
Provide voltage, power, phase count, test duration, site and preferred date.