Installation of AMAK Power Equipment (Inverter and Battery Charger)
مرداد ۱۴۰۵
Fourth Refinery
Installation, positioning and placement of AMAK power equipment, including inverter and battery charger units, with alignment, service-access checks and preparation for connection and commissioning.
Project execution overview
This project was executed at the Fourth Refinery and covered the transfer, positioning and installation of AMAK power equipment, including inverter and battery-charger units. After placing the equipment at the designated locations, the Niawell field team checked alignment and positioning while preserving the required service, connection and commissioning access. The gallery documents equipment arrival, on-site placement, installation work and preparation for operation.